§ 34.01. FEES.
Latest version.
- The fees contained in the City Code are as set forth in the fee schedule set forth below. To the extent not included in the fee schedule as set forth below, the fees set forth in the Code shall remain in full force and effect. The Council may, by resolution from time to time, adopt an amended fee schedule. Costs referred to herein shall include all administrative, technical, engineering, and legal expenses.Code SectionItemCostSalary of Mayor; except as provided below* and**:$2,700.00$30.00 special meeting, $35.00 special meeting out of town**Salary of Council; except as provided below*:$2,200.00$25.00 special meeting, $30.00 special meeting out of town**Planning Commission members and alternates duly appointed by the City Council shall be compensated for attendance at each regular and special Planning Commission meeting$25 per meetingAdministrativeCopying$.25/pageFaxing$2.00/faxNotary$1.00/per documentOrdinance book copy$150.00Clerk research services (Processing Fee)$40.00/hourReturned check charge$35.00Building permit surcharge fee$20.00Voluntary shut-off/activation of water service$100.00Application for service permit:WaterSewer$50.00$50.00Connection fee for:Water mainSewer main$50.00$50.00Involuntary shut-off of water service$100.00Water availability charge (WAC)Sewer availability charge (SAC)$2,545.00$4,737.0050.08 , 52.23Carrying charge on unpaid balances over 30 days10% plus monthly administrative fee of $12.00Nonrefundable water meter deposit$225.00Copper horn (the fee for the water meter and copper horn may be adjusted throughout the year to reflect the city’s actual costs)$60.00Meter inspection$30.00Fine for refusing repair or replacement of a water meterFine for meter tampering$15.00/ month$500.00, plus expense of repairMeter testing deposit$100.00Water rate schedule:Single family residential, multiple family residential per unit, manufactured home park residential per unit, light commercial, and heavy commercial:Base unit charge per month$6.80Use rate charges per month per 1,000 gallons as follows:1 - 6,000 gallons$4.966,001 - 12,000 gallons$6.2012,001 - 24,000 gallons$7.7824,000 gallons or more$11.66Sewer rates:Single family residential, multiple family residential per unit, manufactured home park residential per unit, light commercial, and heavy commercial:Base unit charge per month:$40.70Use rate charges per month per 1,000 gallons$5.4652.56(G)Septic system permits$250.00Trench system$250.00Pressurized system$250.00Holding tanks and replacement tank on-site inspectionPer contractorSite evaluationPer contractorTank(s) pumpingPer contractorMaintenance report administrative fee$10.00Storm water drainage rate$3.50 per REF per monthOpen burning permits$25.00Dog license/cat license$15.00 altered$20.00 non-alteredPenalty for not obtaining a dog license$25.00 per dog92.19(A)(21)Chicken certificate of compliance and inspection feeAnnual inspection fee$50.00$50.00Street excavation permit$75.00Registration fee$40.00Excavation permit fee (driveway)$75.00Excavation permit:Hole$125.00Emergency hole$55.00Trench$70.00/ lin. ft (plus hole fee)Obstruction permit fee$50.00 plus 0.05 lin. ftPermit extension fee$55.00Delay penalty$60.00 plus $10.00/dayMaintenance services$75.00/hour95.07(D)Repeat nuisance call fee$75.0096.04(B)(3)Annual license fee for adult establishments$3,000.0096.04(B)(5)City cost reimbursement deposit by applicant for adult use application investigation$500.0096.04(B)(5)City cost reimbursement deposit by applicant for adult use application investigation (outside Minnesota)$1,500.00Annual on-sale liquor licenseAnnual Sunday liquor license$2,500.00$200.00Annual wine license$1,250.00Off-sale liquor license$100.00On-sale liquor license, one day permit$5.00 per dayAnnual 3.2 permit$100.00Application for on-sale license$100.00, plus costs115.04(D)Peddler, solicitor or transient merchant license application fee:Three-day license$50.00Annual license$150.00Building permitsSee AppendixSign permit$25.00Fence permit$25.00Application for subdivisionEscrow deposit for subdivision shall be as follows:
Admin. lot split $2,000
Plat 1 - 5 lots $3,000 if no public improvements
Plat 1 - 5 lots $5,000
Plat 6 - 20 lots $15,000
Plat 21+ lots $25,000 min. case by case basis
Commercial/
Industrial site plan $15,000 on existing lot$50.00, plus costsDeposit for petition for annexation$15,000.00, plus costsDeposit for planned unit development$50.00, plus costs and $25,000.00 deposit153.080Erosion control and landscape standardsDetermined per developmentParking in residential districts$50.00Application for variance$50.00, plus costs and $1,000.00 depositApplication for conditional use permit$90.00, plus costs and $1,000.00 depositApplication for interim use permitAnnual renewal fee$90.00, plus costs and $1,000.00 deposit$25.00Site plan reviewDetermined per developmentOriginal fire inspection feeAnnual inspection fee$50.00$30.00/hourEngineering Design Standards$200.00/paper$50.00 CDElectronic aerials and contours per acre, 1 acre minimum$20.00/acre1/2 section color aerial maps (22 x 34)$50.001/2 section color aerial w/ parcel information (22 x 34)1/2 section color aerial w/ contour information (22 x 34)Color aerial (11 x 17)$25.00Color aerial (8.5 x 11)Color aerial with parcel or contours (11 x 17)Color aerial with parcel or contours (8.5 x 11)* Mayor and Council Members shall not be entitled to special meeting pay for a special meeting called for the fourth Tuesday of each month.** Special meetings reimbursed up to $1,000.00 per year for the Mayor and each Council Member.(Ord. 2003-7-3, passed 8-12-2003; Am. Ord. 2006-01-04, passed 1-10-2006; Am. Ord. 2006-3-3, passed 3-28-2006; Am. Ord. 2006-3-4, passed 3-28-2006; Am. Ord. 2007-1-3, passed 1-9-2007; Am. Ord. 2007-1-24, passed 1-23-2007; Am. Ord. 2008-1-1, passed 1-10-2008; Am. Ord. 2008-2-2, passed 2-26-2008; Am. Ord. 2008-8-1, passed 8-12-2008; Am. Ord. 2009-3-1, passed 1-13-2009; Am. Ord. 2009-7-2, passed 8-11-2009; Am. Ord. 2010-1-1, passed 1-12-2010; Am. Ord. 2010-4-1, passed 4-13-2010; Am. Ord. 2010-7-2, passed 7-13-2010; Am. Ord. 2011-3-2, passed 3-8-2011; Am. Ord. 2011-6-3, passed 6-14-2011; Am. Ord. 2011-7-1, passed 7-12-2011; Am. Ord. 2011-11-2, passed 11-9-2011; Am. Ord. 2011-11-4, passed 11-9-2011; Am. Ord. 2012-10-2, passed 10-9-2012; Am. Ord. 2013-1-3, passed 1-8-2013; Am. Ord. 2013-2-1, passed 2-12-2013; Am. Ord. 2013-3-2, passed 3-12-2013; Am. Ord. 2014-1-3, passed 1-14-2014; Am. Ord. 2014-4-1, passed 5-13-2014; Am. Ord. 2014-4-2, passed 4-8-2014; Am. Ord. 2014-6-4, passed 6-10-2014; Am. Ord. 2015-1-1, passed 1-13-2015; Am. Ord. 2016-1-2, passed 1-12-2016; Am. Ord. 2017-1-2, passed 1-10-2017; Am. Ord. 2017-3-1, passed 3-14-2017; Am. Ord. 2019-3-3, passed 2-12-2019)